Skip to content

Operational control for hazardous work

Know what is live.Know what must happen next.

Plan, authorize, isolate, execute and close every hazardous job in one traceable permit workflow. Work starts only when the required people and controls are ready.

Permit lifecycle
Energy control
Live work status

Permit lifecycle

Controls before work

Illustrative sample

PTW-HW-0142, Hot work

Replace flange gasket on steam header

Draft
Location
Boiler house, Bay 3
Window
08:00 to 16:00
Crew
4 + 1 contractor
  • SIMOPS: no overlapping work in Bay 3
  • Gas test: O₂ 20.9%, LEL 0%
  • HOD approval, S. Kulkarni
  • Safety officer approval, A. Rao

Energy isolation

  • Steam isolation valve SV-12Thermal
  • MCC panel 3B, feeder 7Electrical
  • Condensate pump P-4Mechanical
  1. Work can start once every isolation is verified.
01

Plan

Scope, site, crew and work window

02

Control

Approval, SIMOPS, gas tests and LOTOTO

03

Prove

Execution evidence and accountable close-out

Designed for demanding work

One safety workflow. Many kinds of site.

From live plants to infrastructure projects, coordinate hazardous work with clear ownership, verified controls and evidence that stays with the permit.

Original illustration of a worker in protective equipment at a controlled construction site

Work at the point of risk

Clearance, controls and field evidence stay connected to the job.

Original illustration of industrial equipment with a verified lockout point

Control hazardous energy

Isolation steps and verification remain visible before work begins.

Original illustration of an operations team reviewing live permit status

Keep the whole site aligned

Teams share one current view of permits, hand-offs and exceptions.

  • Construction & Infrastructure
  • Manufacturing & Industrial Plants
  • Shipyards & Marine
  • Oil, Gas & Chemical
  • Pharmaceuticals & Life Sciences
  • Data Centers & Logistics
  • Facilities Management
  • Energy & Utilities
  • Mining & Metals
  • Aviation & Airports
  • Rail & Transport Infrastructure

One flow, from request to restoration

Each stage has an owner and a gate. The permit only moves forward when the gate is satisfied, and the status your whole site sees changes with it.

  1. 1

    Raise the permit

    Draft

    Permit receiver and operator

    Choose the permit type, location, time window, crew and machinery. The HOD is notified as soon as a draft exists, not when it lands on their desk.

  2. 2

    Clear conflicts

    Pending approval

    Automatic

    SIMOPS compares location, schedule and hazards against every live and pending permit. A clash goes back to the HOD instead of out to the site.

  3. 3

    Approve

    Pending approval

    HOD, then safety officer

    The HOD reviews risk and priority, the safety officer reviews site conditions and gas readings. Either can send it back or reject it, and the reason is kept.

  4. 4

    Isolate

    Approved

    Executor, verified by safety

    A machine-specific LOTOTO plan walks through each energy source in order: lock, tag, try out, photograph. Work stays blocked until every point is verified.

  5. 5

    Do the work

    Active

    Executor and crew

    Time-stamped progress with photos. Pause, near-miss and accident reports sit on the same screen, and an accident stops the permit automatically. Multi-day jobs are revalidated every morning.

  6. 6

    Restore and close

    Closed

    Executor, issuer, HOD

    Isolations come off in sequence with evidence, the area is declared clear, and the issuer and HOD sign the permit off. The whole history stays attached.

Everything the permit touches, in the same system

People, machines, isolations, readings and incidents stay linked to the permit they belong to, so nothing has to be reconciled after the fact.

Plan the work

Permit types
Hot work, confined space, work at height and your own types, each with its own fields and colour.
SIMOPS
Automatic detection of overlapping work by location, schedule and hazard.
Gas testing
Readings recorded against the permit before approval and on revalidation.
Multi-day permits
Daily progress, daily safety revalidation, extensions and validity checks.

Control hazardous energy

LOTOTO plans
Isolation procedures per workstation and machine, covering every energy source.
Sequential lockout
Lock, tag and try-out steps enforced in order, each signed by a named person.
Evidence capture
Photos and logs stored with the step they prove.
Restoration
De-isolation verified step by step before equipment returns to service.

Respond and learn

Incidents and near misses
Reported from the job, linked to the permit, people and machine involved.
Investigations
Root cause, corrective actions and reminders when actions go overdue.
Notifications
In-app and email alerts for approvals, rejections, conflicts and expiring permits.
Dashboards and reports
Views for HODs, safety and management, with PDF, Excel and CSV exports.

Run the organisation

Master data
Departments, locations, workstations and machinery in one catalogue.
Workforce
Employees, contractors and agencies, with the roles they are allowed to hold.
Role authority
Issuer, executor, supervisor, safety officer, HOD and administrator, enforced on every action.
Subscriptions
Modules and usage managed per organisation.

What changes when the permit book goes digital

Safety comes first by design. The system will not let work begin until the mandatory steps are done, and it remembers who did each one.

Paper-based permits compared with PermitWiseAI
Paper and spreadsheetsWith PermitWiseAI
ApprovalsChasing signatures around the plantRouted to the right Approver and safety officer, with reasons on record
Overlapping workDiscovered on the shop floorFlagged by SIMOPS before anyone approves
Isolation proofA tick in a registerEach lock, try-out and restoration signed and photographed
Multi-day jobsYesterday's permit reused without re-checksRevalidated every day before work resumes
AuditsDays of digging through filesComplete history per permit, person and machine
VisibilityPhone calls to find out what is liveLive dashboards for every level of the site

Access and evidence you can defend in an audit

A permit is only worth the signatures on it. These are the controls behind every one.

  • Single sign-on

    OpenID Connect sign-in, with a forced password change the first time an invited user logs in.

  • Enforced authority

    Roles are checked on the server for every action, so a screen can never approve what its user may not.

  • Tenant isolation

    Every record is scoped to its organisation. One customer's permits are never visible to another.

  • Audit trail

    Who created, approved, rejected, locked or closed what, and when, kept with the permit.

Bring your first site online

Tell us about your plant. We will configure your organisation and invite your first administrator.

Request access